Chimney (HR_Chimney_A)Our main chimney is the tallest industrial chimney in the country, and is 15m taller than Canary Wharf. |
New high pressure turbine (HR_DR1751)Upgrading the high pressure and low pressure turbines at Drax will give the station an efficiency approaching 40%. |
Cooling towers (HR_RY0145)Each cooling tower is big enough to hold the dome of St. Paul’s Cathedral in its base. |
Cooling towers (HR_RY0430)What you see coming out of the cooling towers is actually warm clean water vapour, not smoke. |
Generator (HR_RY0533)From the generator the electricity goes to a transformer before it is despatched to the National Grid. |
FGD exhaust gas trunking (HR_RY1107)The FGD plant at Drax is fitted to all six units, and removes over 90% of the sulphur dioxide (SO2) from our emissions. |
Low pressure turbine (HR_RY1402)The low pressure turbines are the biggest of all the turbines. |
Low pressure turbine (HR_RY1428)The temperature and pressure of the steam is greatly reduced when it reaches the LP turbine. |
Low pressure turbine (HR_RY1528)Download low-res version (JPG:51KB) |
Low pressure turbine (HR_RY1530)The turbine blades are fixed to a shaft that rotates as steam hits the blades. |